嗯啊射-嗯啊轻点视频在线观看-嗯啊你轻点好深啊hh在线播放-嗯啊秘书办公室呻吟浪荡-99re在线精品国产欧美-99re在线观看视频

中文
News
News
News and information

Home > News > News Information

Structural design of metal stamping punching die
Time : 2021-10-09 Click count : 1712

1、 Standard structure and function of punching die

Punching die: refers to a general term for molds such as punching, cutting, and trimming.

Before starting the structural design of the mold, the above standard structure should be determined first. When special parts (such as thick parts or high hardness materials) are not suitable for using the above standard structure, two heat treatment pads can be added on this basis.

The working process of the punching die is divided into the following parts according to the movement sequence of the punch press:

1. The punch slider drives the upper mold to move downwards from the high point of the open mold state, while the upper and lower molds are not in contact.

2. When the upper striking plate comes into contact with the lower die punch, the upper striking plate stops moving, and the punch slider continues to move downward. The upper die release spring begins to compress, and the spring presses against the upper striking plate, compressing the stamped part. After a certain distance, the punch installed on the upper clamp plate comes into contact with the punch.

3. The punch slider continues to move downwards, and when it approaches the bottom dead center (closed mold state), all the punches enter the lower mold hole to complete the punching.

4. Punching waste falls from the lower template onto the lower cushion plate and onto the leakage hole of the lower mold seat.

5. After the punch passes through the bottom dead center, the punch slider drives the upper mold to start picking up. At this point, due to the release of pressure, under the action of the upper die release spring force, the upper punching plate will eject the punch from the punch, completing the material dropping. Lower the top material pin of the template and top it up, so that the punch piece returns to its original position.

6. The punch slider drives the upper mold to continue upward, returning to the high point when the mold was opened, completing the stamping process in one go.

be careful:

1. The height of the closed mold should conform to the corresponding height of the closed mold of the selected punch press.

2. When the outer positioning block and inner positioning pin are used simultaneously, the outer positioning is coarse and slightly higher than the inner positioning.

3. The corresponding thickness of each template should refer to and comply with the Flextronics Mold Design Standards.


2、 Design of punching die

1) Enter command T1 in the CAD command bar, and the following dialog box will pop up. Manually enter the relevant information of the template and the closing height, and then click the OK button. (The information entered here will help us automatically generate the content of TOMB after the design is completed)

2) Determine the size of the template based on the layout diagram and copy it to the corresponding layer. Enter command T2 in the CAD command bar, and the following dialog box will appear. Then click the corresponding button to automatically generate template elements for the corresponding layer. If the template is relatively large, you can complete the partitioning work later.

3) Start drawing the punching, positioning, avoidance position and other work contents, and draw detailed side views of the punching, positioning and other work contents in the SID VIEW previously drawn. After completion, the work of dividing the board can be carried out. If the size of the template does not exceed the dimensions specified in the Flextronics mold design standards, there is no need to divide the template. By clicking the Generate Punch button in the CAD toolbar, a dialog box can be obtained, and automatic drawing of punching can be completed by manually entering information.

If the punch to be stretched is not suitable for automatic stretching generation, such as large irregular punch heads that need to be fixed with screws. You can click the button on the toolbar to call the dialog box, and then automatically complete any form of automatic drawing of the strengthening punch.

4) Layout of components such as top material pins, floating blocks, and limit blocks: Top material pins, floating blocks, limit blocks, and other components must use the standard pattern in the template file, and the limit blocks should preferably be square. When using limit blocks in engineering molds, they must be divided into upper and lower parts, and the size value of B must not exceed the height of the lower template. The dimension height of A B must be 0.1 millimeters smaller than the actual closed mold height value.

5) Adjust the size of the upper and lower load-bearing plates, spring plates, and the position of the upper and lower pads, and draw a feeding groove on the lower pad. The feeding groove on the lower pad is clamped at a 60 degree angle.

6) Layout of hardware components and closed molds; When arranging hardware parts (such as screws, pins, spindles, etc.), a dialog box will pop up, requiring manual input of corresponding specifications (such as size, length, etc.) information for the hardware parts. The list of hardware parts will be automatically generated based on this information. The size of the template fixing screws should be M10 with a spacing of 150-250 millimeters.

7) Perform self inspection on the structure and check one by one according to the final design re inspection form to reduce routine errors. After completing this form, it needs to be kept properly until all drawings are signed and approved.

8) Add a frame to the image file, fill in the frame content, and compile TOMB;

Before starting the design, we carefully edited the relevant information of each template. Now, we can use the Q-TOMR button in the dialog box to quickly complete TOMB compilation for templates only. Then other functional buttons can be used to complete the compilation of the relevant TOMB parts.

9) Generate BOM tables such as STOCK LIST, STANDARD LIST, SCREW LIST, PERF CHART, etc; Use the STOCK LIST.STANDARD LIST and SCREW LIST buttons in the dialog box to automatically generate the corresponding tables.

Clicking the button on the toolbar will display a dialog box, and then clicking the "PERF LIST" button will automatically generate a list of all punching related items.

10) Check and dismantle drawings

After completing the overall layout design and generating all tables, it is necessary to submit the design drawing inspection record table and the entire design to LEADER for inspection, and then modify any unreasonable parts.

After the modification is completed, the drawing can be disassembled, and the specific operation method needs to refer to the LDS course textbook and Flextronics mold design standards.


3、 Sign off and produce drawings

1) Check whether the disassembled and printed drawing files are newly revised drawing files, whether the drawings are consistent with the drawing files, and whether there are any omissions in the saved drawing files. Check whether the drawing files and drawings are complete. Hand it over to the supervisor for signature.

2) Put the signed electronic drawings into the exchange area, fill out the drawing distribution and bidding list to complete the design.

News Related news
欧美性色黄大片| 秋霞欧美在线观看| 欧美fxxxxxx另类| 欧美亚洲日本黄色| 欧美日韩国产天堂| 无码黑人精品一区二区| 成人三级视频| 欧美日韩在线精品| 国产美女视频一区二区三区| 欧美色videos| 黄色av一级片| 麻豆精品精品国产自在97香蕉| 国产中文字幕在线免费观看| xxxcom在线观看| 欧美激情综合色| 黑人巨大狂躁日本妞在线观看 | 亚洲xxx大片| 国产aa视频| 亚洲精品久久久久久久久| 日韩一级片免费在线观看| 国产精品久久毛片a| 激情五月婷婷小说| 国产高清在线精品| 蜜桃av免费观看| 久久三级福利| 亚洲精品性视频| 欧美日韩中字| 宅男噜噜噜66国产免费观看| 都市激情亚洲| 成人免费在线网| 欧美成人午夜77777| 免费在线看黄色片| 亚州综合一区| 欧美精品一区免费| 国产欧美三级电影| 桥本有菜av在线| 日韩精品中文字幕吗一区二区| 天天综合色天天| 丰满肉嫩西川结衣av| 欧美午夜xxx| 麻豆精品视频在线原创| 欧美24videosex性欧美| 最近2019中文字幕一页二页| 男女无套免费网站| 97在线看福利| 国产粉嫩在线观看| 天堂av在线中文| 成人久久综合| 97香蕉碰碰人妻国产欧美 | 亚洲精品老司机| av中文字幕网| 亚洲女人被黑人巨大进入| 在线播放的av| 成人午夜在线观看| 韩国精品视频在线观看 | 亚洲丶国产丶欧美一区二区三区| 亚洲日本中文字幕在线| 亚洲欧美成人在线| 日韩经典av| 99999精品视频| 激情欧美一区二区| 国产按摩一区二区三区| 亚洲精品综合久久中文字幕| 成人亚洲性情网站www在线观看| 日韩免费三级| 亚洲国产一区二区精品专区| 国产无遮挡aaa片爽爽| 欧美性xxxx在线播放| 美女翘臀白浆直流视频| 国产成人精品免费视频| 免费福利视频一区| 午夜激情视频在线播放| 九一免费看片| 国语自产精品视频在线看一大j8| 6699嫩草久久久精品影院| 萌白酱国产一区二区| 亚洲午夜天堂| 日本黄色一级网站| 精品国产乱码久久久久久浪潮| 一本大道香蕉久在线播放29| 久久综合九色99| 国产精品亚洲产品| 免费成人在线看| 欧美孕妇与黑人孕交| 丝袜连裤袜欧美激情日韩| 老熟妇一区二区| 欧美日韩国产在线观看| 免费成人黄色| 一级黄色片在线免费观看| 综合久久一区二区三区| 免费av一级电影| 日本黄色播放器| 97久久精品人人爽人人爽蜜臀| 国产激情视频一区二区三区| 成人精品福利视频| 欧美在线视屏| 免费观看黄色av| 国产精品丝袜高跟| 日韩视频一区二区三区在线播放免费观看| 亚洲视频在线观看不卡| 欧美一区二区综合| 国产精品色呦呦| 午夜伦理福利在线| 久久久久国产精品夜夜夜夜夜| 播播国产欧美激情| 亚洲美女少妇无套啪啪呻吟| 2017天天干夜夜操| av中文字幕网址| 亚洲第一在线视频| 欧美日韩亚洲在线观看| 一区二区三区小视频| 日韩欧美精品一区二区| av激情网站| 性刺激综合网| 一区二区三区在线免费播放| 亚洲校园激情春色| 天天操天天操天天操天天| 日韩美女视频中文字幕| 国产一区二区日韩精品| 国产一二三区在线视频| 中文字幕影音先锋| 97国产超碰| 亚洲美女在线国产| 国产不卡精品在线| 四虎永久成年免费影院| 日韩国产激情在线| 夜夜精品视频| 在线激情网站| 老熟妇一区二区三区啪啪| 欧美精品一区三区在线观看| 精品高清一区二区三区| 欧美精选一区| 97影院理论午夜| 精品人妻在线视频| 欧美成年人在线观看| 99久久国产免费看| 日韩成人综合网站| 国产精品冒白浆免费视频| 欧美夫妇交换xxx| 欧美综合一区第一页| 亚洲猫色日本管| 日韩欧美午夜| 91青青草免费在线看| 午夜视频一区二区| 外国成人免费视频| www.亚洲视频| 亚洲色图视频在线观看| 日韩精品在线播放视频| 日本精品性网站在线观看| 中文字幕亚洲成人| 在线成人直播| 超碰中文在线| 在线观看成人影院| 久久国产香蕉视频| 中国黄色片免费看| 亚洲xxxx在线| 综合网中文字幕| 好吊成人免视频| 日韩精品乱码免费| 伊人久久大香线蕉av超碰| 最新天堂资源在线资源| 区日韩二区欧美三区| 中文字幕第三区| 久久精品日产第一区二区三区精品版| 亚洲精品永久免费| 偷拍一区二区三区| 99久久国产免费看| 亚洲高清在线| 国产在线播放精品| 免费观看成人高潮| 夜夜摸视频网| 婷婷视频在线观看| 68精品久久久久久欧美| 精品一二三四| 国产污视频网站| 91成人精品一区二区| 91福利免费观看| 800av在线免费观看| 久久久久久久久久久久久9999| 久久久女人电视剧免费播放下载| 欧美成人艳星乳罩| 色菇凉天天综合网| 一区二区三区毛片| 综合久久给合久久狠狠狠97色| 国产成人午夜视频| 国产乱理伦片在线观看夜一区| 国产精品va| 亚洲国产第一| 宅男噜噜噜66一区二区| 黄色精品网站| 99国产精品久久久久久久成人热| 国产在线美女| 青青草视频在线观看| 自拍偷拍第1页| 3d黄动漫网站| 中文在线有码| jizz在线免费观看| www在线观看播放免费视频日本| 东凛在线观看| heyzo高清在线|